Foundation of Isotoptech Zrt.

1998
\
Timeline main image

Our first self-developed equipment (Radaqua water sampler)

2000
\
Timeline main image

Isotoptech installs its first measuring equipment at Atomki (Delta plus XP stable isotope ratio mass spectrometer)

2003
\
Timeline main image

Purchase of a quadrupole mass spectrometer

2004
\
Timeline main image
  • Company won its first tender (purchase of Quantulus)
  • The Company obtained the ISO 9001 Certificate
  • Development of the radioanalytical department (purchase of HPGe gamma spectrometer)
2005
\
Timeline main image

Renovation of few Atomki laboratories, ISOTOPTECH signs a 25-year cooperation agreement with the MTA Atomki

2006
\
Timeline main image

Inauguration of the new Ede Hertelendi Laboratory of Environmental Studies (Building II), laboratory was completely renovated in terms of equipment and infrastructure

2007
\
Timeline main image
  • Significant equipment investment at the radioanalytical department (TriCarb 3180 LSC, InSpector 1000, Tritahler LSC, BIG MAC HPGe)
  • Planning and installation of the Radiation Protection, Environmental and Emission Control Systems for the National Radioactive Waste Repository in Bátaapáti
2008
\
Timeline main image

Development of radiocarbon sample preparation laboratory

2009
\
Timeline main image
  • Construction of the radiocarbon and noble gas laboratory (complete renovation of Building VII)
  • Procurement and installation of EnvironMICADAS AMS instrumentation
2011
\
Timeline main image

Start-up of Water Analysis Laboratory, renovation of the associated department (Metrohm 850 Pro IC, Shimadzu UV-2600)

2012
\
Timeline main image
  • Acquisition of large lab instruments for the Water Analysis Laboratory: ICP-MS Agilent 8800 TripleQuad, MP-AES 4100, TOC/TN
  • Mechanical workshop renovation
  • New electronics workshop
2013
\
Timeline main image

Acquisition of accredited status

2014
\
Timeline main image

Workshop upgrade - installation of water cutting equipment

2016
\
Timeline main image
  • Establishment of a radiochemistry laboratory
  • Development of the noble gas laboratory with the new Thermo® HELIX SFT noble gas mass spectrometer
2018
\
Timeline main image
2019
\
Timeline main image
  • Establishment of the INTERACT Competence Centre
  • Installation of a radiation protection and emission monitoring system as part of the safety enhancement programme of RHFT in Püspökszilágy
2020
\
Timeline main image
  • Upgrading the stable isotope laboratory with a new Thermo Delta V plus stable isotope ratio mass spectrometer
  • Modernisation of the machinery in the mechanical workshop (CNC machines, 3D printer)
  • Implementation of a radiation protection system at the reserve management point of MVM Paks Nuclear Power Plant Zrt.
2021
\
Timeline main image

Installation of a new AMS-stable isotope coupled system (Thermo/NEC PIMS)

2022